1. Construction should be carried out when the air temperature is between 5°C and 35°C. Construction on wet surfaces is not recommended, and exposed projects should not be constructed in windy or rainy weather.

2. Original sealed products should be stored in a dry, cool environment above 0°C. Under normal storage and transportation conditions, the product has a shelf life of one year.

3. This product is not flammable or explosive and can be transported as general cargo. During transportation, avoid exposure to direct sunlight and extremely cold temperatures.